Zanini Auto Group is a global automotive supplier specialised in decorative and functional components for vehicles, including wheel covers and radar-transparent radome covers for ADAS systems. The Advanced R&D and Innovation Department focuses on next-generation solutions for autonomous driving sensor integration, with a strong emphasis on mmWave radar compatibility.

Role & Responsibilities

Zanini Auto Group Trainee GANTT

Working within the Advanced R&D and Innovation Department, supporting RF engineering activities at mmWave frequencies (77 GHz) for automotive radome applications.

Topic 1 — Motor Controller for RF Measurement Systems

Design and assembly of a motor controller to automate three distinct RF measurement setups: VNA-based radome imaging, 77 GHz automotive radar testing, and radome material characterisation. A cost-effective TMC2226 stepper motor driver was selected. Firmware developed using MBED Studio combined with STM32CubeIDE.

Topic 2 — VNA Calibration Kit for Vertical Measurement System

Reconfigured the measurement system from horizontal to vertical orientation, replacing classical TRL calibration with TRM to reduce motor actuators and improve repeatability.

Topic 3 — SAR Backpropagation from Reduced Sampling

Investigation into Synthetic Aperture Radar (SAR) backpropagation algorithms applied to a reduced number of spatial samples, significantly reducing total measurement time without compromising image reconstruction quality.

Additional Contributions

  • SMD soldering for LED PCBs used in promotion campaigns.
  • Support in self-developed FMCW radar measurement campaigns for DoA characterisation.
  • Radar Target Simulator (RTS) debugging assistance.